Wind Dynamic Modelling

Wind Dynamic Modelling

EirGrid maintains a Model Register that outlines the current status of the wind turbine generator dynamic models, which have been provided, with respect to the Planning Code Appendix of the Grid Code (PCA4.10.1) and its subsections.

All transmission and distribution wind farms greater than 5 MW, with signed connection agreements, are required to provide a dynamic model, to EirGrid, no later than 240 business days (1 year) prior to their scheduled date of connection to the power system.

All dynamic models must meet with the requirements as set out in section PCA4.10.1.2 of the Planning Code and be compliant with PSS/E versions 29 and 30.

The lastest version of the Model Register can be downloaded from the list below.

Wind Dynamic Modelling

 

TitleEffective Date
Model Register January 2012                  16-01-12
Model Register July 2011 28-07-11
Model Register June 2011 14-06-11
Model Register - 20 Jul 2010 20-07-10
Model Register - 15 Dec 2009 15-12-09
Model Register - 18 July 2008 (v2) 18-07-08
Model Register - 18 Jan 2008 18-01-08
Model Register - 19 Jul 2007 19-07-07
Model Register - 1 Jun 2007 01-06-07
Model Register - 12 Apr 2007 12-04-07
Model Register - 26 Feb 2007 26-02-07
Model Register - 20 Dec 2006 20-12-06
Model Register - 3 Oct 2006 03-10-06
Model Register - 13 Sep 2006 13-09-06