You are here: East West

East West Interconnector

EirGrid has developed the East-West Interconnector linking the electricity grids of Ireland and Britain. The Interconnector is a 500 MW regulated HVDC link. It is fully compliant with all EU legislation and provides an increased opportunity to market participants to trade electricity between the Single Electricity Market (SEM) on the island of Ireland and British Electricity Trading and Transmission Arrangements (BETTA) market in Great Britain. The East West Interconnector started commercial operation on 21st December 2012. 

 

NOTE: Safety is core to how EirGrid does business.

To determine if your proposed works may be close to the route of the interconnector, please refer to the following links:

ROI B-4-U-DIG

UK Line Search Before-U-Dig

• or by dialing this number ROI (01) 2370924 or in the UK 01244 288 353.

Follow the Required Procedure: East West Safety Notice

In the event of an Emergency related to the East West Interconnector cables, EirGrid shall be contacted immediately. The Emergency (24/7) contact number is 01 2370924; Select Option 1.