Search the site




Welcome to EirGrid

EirGrid plc is the independent electricity Transmission System Operator (TSO) in Ireland and the Market Operator in the wholesale electricity trading system.

 

EirGrid's role is to deliver quality connection, transmission and market services to generators, suppliers and customers utilising the high voltage electricity system, and to put in place the grid infrastructure required to support the development of Ireland's economy.  It is a state-owned company.

 

EirGrid develops, maintains and operates a safe, secure, reliable, economical and efficient transmission system. EirGrid is playing a key role in the operation of the Single Electricity Market, as well as developing key infrastructural projects such as the East-West Interconnector, a second Cavan-Tyrone Power Line ,a Meath-Cavan Power Line and Cork Harbour Connections.

 

For details of the legislation establishing EirGrid please see our Legal page or the Publications link.

 

 

 

 

 

 


Latest News

Annual Report

English Version Leagan Gaeilge

 

Press Conference

News Release Photo Audio


Power Line Projects

Meath Cavan Power Line

Cavan Tyrone Power Line

 

Feedback on new power lines - you can contact us on the information line found below between 9am-5pm (Mon-Fri) or email us at the following addresses:


Email: MeathCavanPower@eirgrid.com

Email: CavanTyroneInterconnector@eirgrid.com

Telephone: 1890 25 26 90

 

ELECTRICITY AND HEALTH (EMF)


18.07.08 Wind Dynamic Modelling Update  
The Dynamic Model Register has now been updated.  

17.07.08 EirGrid 2007 Annual Report launched  
Highlights: Continued development of high quality electricity infrastructure; Delivery on-time and on-budget of the Single Electricity Market; Progress on East West Interconnector with Wales; Continued high quality, reliable electricity supplies.  

16.07.08 EirGrid Monthly Availability Report - June 2008  
This report shows generation availability including figures for power units and the overall system, covering scheduled outages and forced outages.  

13.06.08 Transmission System Performance Report 2007  
This report contains transmission system data and performance statistics for the year 2007.  

30.04.08 New Version of Grid Code Published  
Following the approval of the Grid Code modifications from the GCRP in November 2007 by CER, EirGrid has now published Grid Code Version 3.1.  

17.04.08 EirGrid Chief Executive addresses Engineers Ireland Annual Conference  
Action needed on fuel security, critical infrastructure and competition